CALL US!
+1 (305) 253 6038
Get in touch
sales@insupplyco.com
Global
Suppliers
ONE NEW SURPLUS
GE TM2500+ MOBILE GAS
TURBINE GENERATOR
PACKAGES DUAL FUEL 50/60HZ
TM2500 mobile aeroderivative gas turbine
INTRODUCING ONE OF THE WORLD’S MOST MODULAR, RELIABLE, AND EXPERIENCED MOBILE GAS TURBINES.
With more than 20 years of experience and 300 units installed around the world, the TM2500 is a proven solution for providing a baseload bridge to permanent power installations or for generating backup power in the wake of natural disasters, plant shutdowns, grid instability or isolated locations. Get the power you need—fast—with GE's TM2500 mobile aeroderivative gas turbine generator set. Our mobile solutions—including trailer-mounted gas turbine generator set and containerized balance of plant—can put power on the grid within 30 days of contract signature.

11 days

Installation and
Commissioning Time

33-36 MW

Net
Output

Up to 37%

Efficiency

5 min.

Start
Time

300+

Units Installed
Worldwide

Product features
GET TO KNOW THE TM2500

The TM2500 can operate on a wide variety of fuels including gas, LPG and/or distillate liquid fuel.

With installation and commissioning in as few as 11 days, a TM2500 can help you respond quickly to emergency situations—or help generate back up power during natural disaster relief, plant shutdowns or grid instability.

With 37% efficiency (higher than most grids), and the ability to add 34-37MW of power as your need increases, the TM2500 can grow as you need it to.

The TM2500 has more than 300 units deployed worldwide and over 6 million hours of operating experience.

Product features
TAKE A CLOSER LOOK
View by: 50 Hz selected 60 Hz selected
Simple Cycle Specifications - 50 HZ TM2500(WET) TM2500(DRY)
Net output(MW) 33.7 32.5
Net heat rate (Btu/kWh, LHV) 9,754 9,245
Net heat rate (kJ/kWh, LHV) 10,291 9,754
Net efficiency (%, LHV) 35.0% 36.9%
Ramp rate (MW/minute) 20 20
Startup time (cold iron) (min.) 5 5
TM2500 additional specifications TM2500(WET) TM2500(DRY)
Reliability 99.5% 99.5%
Availability 98.7% 98.7%
Start reliability 98.35% 98.35%
Fleet operation hours 77.9M 77.9M
Hot section hours 25,000 25,000
Overhaul hours 50,000 50,000
NOx emission (ppm) (@ 15% O2) 25 25
Package noise (dBA average) <90 <90
Combustion SAC SAC
Simle Cycle Specifications - 60 HZ TM2500(WET) TM2500(DRY)
Net output(MW) 36 33.3
Net heat rate (Btu/kWh, LHV) 9,318 8,886
Net heat rate (kJ/kWh, LHV) 9,831 9,375
Net efficiency (%, LHV) 36.6% 38.4%
Ramp rate (MW/minute) 20 20
Startup time (cold iron) (min.) 5 5
TM2500 additional specifications TM2500(WET) TM2500(DRY)
Reliability 99.5% 99.5%
Availability 98.7% 98.7%
Start reliability 98.35% 98.35%
Fleet operation hours 77.9M 77.9M
Hot section hours 25,000 25,000
Overhaul hours 50,000 50,000
NOx emission (ppm) (@ 15% O2) 25 25
Package noise (dBA average) <90 <90
Combustion SAC SAC
Note: All the rating are based on ISO conditions and natural gas fuel. Actual performanse will vary with project-
specific conditions and fuel.
Download TM2500 FACT SHEET(PDF)
TM2500 Services
GET MORE FROM YOUR TURBINE
Our services team is prepared to meet your industry-specific requirements and provide more reliable aeroderivative gas turbine services whether you’re looking for peaking power, flexible response to immediate grid demands, or simply to keep your operation up and running at a proven 99% rate of reliability.

Upgrades

Our gas turbine can boost performance and reliability. deliver better efficiency and flexibility and extend assets.Our gas turbine can boost performance and reliability. deliver better efficiency and flexibility and extend assets.Our gas turbine can boost performance and reliability. deliver better efficiency and flexibility and extend assets.
EXPLORE TM2500 UPGRADES

Maintenance and repairs

From outages as short as two days—with module and engine exchanges—to customized off-season outages, equipment and engine leasing, upgrades, digital solutions and repairs, our network of global service centers and field service teams combine the highest quality of expertise and technical aeroderivative gas turbine support with timely, flexible solutions and predictable repair costs.
EXPLORE TM2500 MAINTENANCE SOLUTIONS

Multi-year agreements

Our tailored strategic Fleet360* Multi-Year Agreements (MYA) are designed to help you focus on your core business, delivering productive outcomes including plant profitability, competitiveness on the dispatch curve for utilities, and long-term reliability for industrial sites.

*Trademark of General Electric Company
DISCOVER OUR MYAS
TM2500 case studies
WHAT CUSTOMERS ARE SAYING
Want to see how organizations just like yours are using the TM2500? Take a look at our Case studies:

Algeria

In 2012, Algeria faced a drastic need for more power, particularly during the hot summer months when there is close to 10% annual growth in electricity demand. To help meet this demand, GE delivered six TM2500 mobile gas turbine generators delivering 120 MW of power followed by another 24 units in 2013 that provided more than 480 MW of power. The units were commissioned, delivered and operational in time to meet the northern districts of M’Sila and Fkirina’s 2013 summer peak electricity demand. After the seasonal peaks, some of the units were deployed to other cities in the south of the country to serve as permanent power. In 2014, Algeria received an additional 8 units to meet their peak needs for that year’s summer month season.

Ecuador

In 2009, Ecuador experienced its worst drought in 40 years. Coupled with the country’s dependence on hydropower generation, the drought set off a chain reaction, resulting in 30% of the country’s thermal power plants becoming non-operational, and daily power cuts in the country. After the country signed a contract with GE in November, things moved quickly. With the help of seven TM2500 gas turbines, the country was able to commission 160 MW of power in just 12 weeks. The first TM2500 brought Ecuadorian lights on by Christmas, and power cuts ended in January.

Egypt

With rapid economic growth and an expanding population, Egypt is a country in transition. Its desert climate necessitates a massive amount of power generation. In December 2014, GE and the Egyptian government took vital steps towards meeting the sharp increase in the country’s electricity demand. GE provided 20 TM2500 generator sets—totaling 500 MW of total power—and promised to install and commission all units within six months in order to meet 2015’s hot summer.

Angola

Angola is one of Africa’s richest countries in terms of natural resources, but still millions of people need access to electricity. The country is engaged in a priority program to create a modern energy infrastructure. Since 2010, GE has worked with the government of Angola to provide more than 20 TM2500 mobile gas turbine generators, creating more than 500 MW of onsite power in Angola’s cities, improving grid reliability and bridging the energy gap during construction of a long-cycle hydro plant.

Watch Video

Restoring Power In Mexico
LIGHTING UP BAJA

Hurricane Odile hit Mexico’s Baja Peninsula in September 2014, and was one of the most destructive storms in the country’s history. But with the help of four TM2500s, GE was able to work together with Mexico’s Federal Electricity Commission (CFE) to get emergency power up and running in less than two weeks helping the CFE restore power to full capacity for the thousands of people impacted by the hurricane.

“It normally takes a month to deploy a single unit, but we were able to cut that time in half.” -- Gerardo Villavicencio, GE

Japan

On March 11, 2011, the world’s costliest natural disaster to date occurred when a 9.1 magnitude earthquake struck off the coast of Tohoku, Japan and initiated a tsunami with waves that reached 40.5 meters (133 ft) and traveled up to 10 km (6 miles) inland. Within 30 days of the disaster, GE had made more than 20 gas turbine units available for the region including 10 flexible-use TM2500 aeroderivative units which together could produce 250 MW for the region.

Yemen

Yemen struggles to maintain reliable power generation, even in its densely-populated areas as a result of the challenging period it experienced. Cities can lose electricity and water without notice—making day-to-day tasks nearly impossible. In 2017 GE supplied two TM2500 on the al-Hiswa fast power expansion project, making them the first GE aeroderivative gas turbines in Yemen. These turbines were brought up and running quickly, providing 60 MW of additional power just in time for 40°C temperatures during the fasting month of Ramadan.

Myanmar

Fast-growing Yangon needs more electricity urgently because demand outstrips supply in the peak season, resulting in power outages throughout the city. In 2017, GE deployed one TM2500 as one of the initiatives completed by the Yangon Regional Government to boost power generation capacity in Myanmar’s largest industrial, commercial, and public sector districts.

Building fast power
WONDERING HOW WE MAKE OUR TM2500S?
Take a look inside the manufacturing facility in Hungary.
Don't You Find What You Need?
If you do not find in this section some of the equipment, materials or part that you need, do not hesitate to contact us.
We wanr to know what your request is. Contact us, we are convinced that we can help you.
HEAD OFFICE
 

11225 SW 134th Terrace
Miami, FL 33176. USA

 

+1 (305) 253 6038
+1 (305) 431 9783

 

+1 (305) 253 6039

 

sales@insupplyco.com

SAY HELLO
1-for-sale-offer